884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2019年>> 第12期>>正文內(nèi)容
青島城陽萬象匯新增商務(wù)酒店結(jié)構(gòu)加固設(shè)計
肖艷1,姜永光1,井彥青1,李建峰1,楊龍1,董恒1,萬墨罕1,王立超2
摘 要

(1 青島騰遠設(shè)計事務(wù)所有限公司騰遠精工工程咨詢院,青島 266000;2 華潤置地有限公司, 北京 100024)

[摘要]青島城陽萬象匯項目原設(shè)計地下2層,地上4層,結(jié)構(gòu)屋面高度23-950m,為框架結(jié)構(gòu)體系,基礎(chǔ)形式為樁基承臺+防水板。2015年主體施工完畢并通過了驗收,2016年對原商業(yè)部分進行了加固改造,且在原純地庫范圍加建一棟10層的商務(wù)酒店,建筑總高48-4m。本著“減少拆除、保證安全、兼顧施工”的原則,酒店主體選用框架結(jié)構(gòu),基礎(chǔ)加固設(shè)計時最大限度地保留了原結(jié)構(gòu),新增建筑采用筏板基礎(chǔ)。計算時考慮了樁土共同作用工況、樁破壞工況及各荷載工況的影響,對原基礎(chǔ)和新增筏板基礎(chǔ)在施工及使用階段的受力進行分析。結(jié)果顯示,基礎(chǔ)沉降、地基承載力均滿足規(guī)范要求,基礎(chǔ)設(shè)計安全。同時也表明所設(shè)計的筏板基礎(chǔ)方案具有現(xiàn)場施工方便、工期短、造價低的優(yōu)點。

[關(guān)鍵詞]加固改造; 抗浮設(shè)計; 包絡(luò)設(shè)計; 筏板基礎(chǔ)

中圖分類號:TU443文獻標(biāo)識碼:A文章編號:1002-848X(2019)12-0047-06

 

Structural reinforcement design of New Business Hotel in Chengyang Wanxianghui in Qingdao

Xiao Yan1, Jiang Yongguang1,  Jing Yanqing1,  Li Jianfeng1,  Yang Long1, Dong Heng1,  Wan Mohan1,  Wang Lichao2

(1 Tengyuan Precision Engineering Consulting Institute,Qingdao Tengyuan Design Institute Co., Ltd., Qingdao 266000, China;2 CR Land Co., Ltd., Beijing 100024, China)

Abstract:The original design of Chengyang Wanxianghui Project in Qingdao has two stories underground and four stories above ground. The roof height of the structure is 23-950m. It is a frame structural system and the foundation form is pile cap and waterproof board. In 2015, the construction of the main body was completed and achieved the acceptance of engineering works. In 2016, the original structure was strengthened and reconstructed, and a 10-storey commercial hotel was built in the original pure basement area, with a total height of 48-4m. In line with the principle of "reducing demolition, ensuring safety and giving consideration to construction", the main body of the hotel adopted frame structure, while the original structure was retained to the maximum extent in the design of foundation reinforcement, and raft foundation was adopted in the new building. The effects of pile-soil interaction, pile failure and load conditions were taken into account in the calculation. The forces acting on the original foundation and the newly added raft foundation during the construction and use stages were analyzed. The results show that the foundation deformation and bearing capacity meet the requirements of the code, and the foundation design is safe. At the same time, it shows that the raft foundation scheme has the advantages of convenient construction on site, short construction period and low cost.

Keywords:reinforcement and reconstruction; anti-floating design; envelope design; raft foundation

 

作者簡介:肖艷,學(xué)士,工程師,一級注冊結(jié)構(gòu)工程師,Email: xiao.yan1@tengyuan.com.cn。

下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點此注冊吧!

    如果你已經(jīng)注冊但還沒登錄,請趕緊點此登錄吧!