日照華潤中心塔樓超限高層結(jié)構(gòu)設(shè)計(jì)
井彥青,丁相飛,趙俊沂,姜永光,李強(qiáng),劉于晨,紀(jì)建猛,宋楊
摘 要

(青島騰遠(yuǎn)設(shè)計(jì)事務(wù)所有限公司騰遠(yuǎn)精工工程咨詢?cè)?,青島 266000)

[摘要]日照華潤中心商業(yè)二期總建筑面積約15萬m2,地下3層,地上50層,嵌固層以上高度為182-6m,屬于超B級(jí)高度建筑。塔樓采用框架-核心筒結(jié)構(gòu)體系,附帶商業(yè)裙房采用框架-剪力墻結(jié)構(gòu)體系。該項(xiàng)目1~9層為酒店用房,對(duì)框架柱截面要求較高,設(shè)計(jì)采用鋼管混凝土疊合柱,滿足建筑使用要求。該工程存在扭轉(zhuǎn)不規(guī)則、裙房宴會(huì)廳大跨度轉(zhuǎn)換、樓板局部不連續(xù)等超限項(xiàng)。在設(shè)計(jì)過程中進(jìn)行了結(jié)構(gòu)整體抗震性能分析,包含小震彈性計(jì)算、小震彈性時(shí)程分析、中震彈性及不屈服計(jì)算、大震不屈服計(jì)算及動(dòng)力彈塑性分析等,對(duì)核心筒周邊支承較大跨度次梁的連梁及在核心筒周邊存在的缺口梁進(jìn)行應(yīng)力分析。結(jié)果表明,結(jié)構(gòu)整體分析和構(gòu)件計(jì)算分析滿足規(guī)范要求,結(jié)構(gòu)安全可靠。

[關(guān)鍵詞]超限高層結(jié)構(gòu)設(shè)計(jì); 鋼管混凝土疊合柱; 公寓Loft-次結(jié)構(gòu); 連梁應(yīng)力分析; 缺口梁應(yīng)力分析

中圖分類號(hào):TU375文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2019)12-0013-06

 

Out-of-code high-rise structure design for building of Rizhao China Resources Center

Jing Yanqing, Ding Xiangfei, Zhao Junyi, Jiang Yongguang, Li Qiang, Liu Yuchen,Ji Jianmeng, Song Yang

(Tengyuan Precision Engineering Consulting Institute, Qingdao Tengyuan Design Institute Co., Ltd., Qingdao 266000, China)

Abstract:Rizhao China Resources Center Commercial Phase II, with a total construction area of about 150 000 square meters, has 3 floors underground and 50 floors above ground. The height is 182-6m above the embedded layer. The structure belongs to the building with the height exceeding level-B height. The tower adopts the frame-corewall structural system, and the attached commercial podiums adopt frame-shear wall structural system. The 1~9 floor of the project is a hotel, which has high requirement for the cross-section of the frame columns. The concrete-filled steel tube(CFST) superimposed columns were used to meet the requirements of the building. There are some out-of-code items in the project, such as torsion irregularity, large-span transformation of podiums and banquet hall, and partial discontinuity of floor slabs. In the design process, the overall seismic performance of the structure was analyzed, including elastic calculation under frequent earthquake, elastic time-history analysis under frequent earthquake,elastic and unyielding calculation under fortification earthquake, unyielding calculation and dynamic elastic-plastic analysis under rare earthquake, etc. The  stress analysis was carried out for the  corewall coupling beams supporting the large-span secondary beams and the notched  beams around the corewall. Results show that the structural integral analysis and component calculation analysis meet the requirements of the code, and the structure is safe and reliable.

Keywords:out-of-code high-rise structural design; CFST superimposed column; secondary structure for apartment loft; stress analysis of coupling beam; stress analysis of notched beam

 

作者簡介:井彥青,學(xué)士,教授級(jí)高級(jí)工程師,一級(jí)注冊(cè)結(jié)構(gòu)工程師,Email: 0532jyq@sina.com。