后澆帶設(shè)置問(wèn)題的深入探討
李國(guó)勝1,2
摘 要

(1 銅陵市建筑工程施工圖設(shè)計(jì)文件審查有限公司, 銅陵 244000; 2 銅陵市建設(shè)工程質(zhì)量監(jiān)督監(jiān)測(cè)有限公司, 銅陵 244000)

[摘要]由于國(guó)家規(guī)范、規(guī)程和有關(guān)手冊(cè)對(duì)收縮后澆帶和沉降后澆帶的設(shè)置、構(gòu)造、配筋和沉降計(jì)算無(wú)統(tǒng)一規(guī)定,對(duì)于有些內(nèi)容,不同規(guī)范的規(guī)定要求又不一樣,甚至互相矛盾,致使在設(shè)計(jì)中使用比較混亂、關(guān)鍵問(wèn)題交代不清,設(shè)計(jì)存在安全隱患。通過(guò)對(duì)收縮后澆帶和沉降后澆帶的深入探討,較全面地回答了如下關(guān)鍵問(wèn)題:后澆帶的設(shè)置要求及相關(guān)構(gòu)造;后澆帶澆筑時(shí)間;結(jié)構(gòu)長(zhǎng)度超規(guī)范時(shí)是否必須設(shè)收縮后澆帶;高層和裙房之間是否必須設(shè)沉降后澆帶;設(shè)沉降后澆帶如何控制沉降差、基礎(chǔ)和上部結(jié)構(gòu)內(nèi)力如何計(jì)算等。

[關(guān)鍵詞]收縮后澆帶; 沉降后澆帶; 斷開(kāi)模型; 整體模型; 補(bǔ)償收縮混凝土; 膨脹劑; 后期沉降差; 附加內(nèi)力

中圖分類(lèi)號(hào):TU318, TU755文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2019)03-0038-08

 

Deep investigation on post-cast strip setting

Li Guosheng1,2

(1 Tongling Construction Engineering Drawing Design Review Co., Ltd., Tongling 244000, China;2 Tongling Construction Engineering Quality Supervision and Monitoring Co.,Ltd., Tongling 244000, China)

Abstract:There is no uniform regulation for the setting, construction, reinforcement and settlement calculation of shrinkage post-cast strip and settlement post-cast strip in national codes, regulations and relative manuals. For some content, the requirements of different codes are different, or even contradictory. As a result, these codes would not been  very clearly understood by many designers and are used in disorder in design; the key problems are not clear in design as well, resulting in potential safety hazard in later design. Through the deep investigation of the shrinkage post-cast strip and settlement post-cast strip, some key questions were answered in a relatively comprehensive way, such as  setting requirements and related construction of post-cast strip;  the casting time of post-cast strip; whether must shrinkage post-cast strip be designed when structural length exceeds the code; whether must settlement post-cast strip be designed between high-rise buildings and podiums; how to control differential settlement  and how to calculate the internal force of foundation and superstructure for the settlement post-cast strip designed  etc.

Keywords:shrinkage post-cast strip; settlement post-cast strip; disconnected model; integral model; expansive shinkage concrete; expanding agent; later differential settlement; additional internal force

 

作者簡(jiǎn)介:李國(guó)勝,學(xué)士,高級(jí)工程師,Email:693950802@qq.com。