- 摘 要
-
(中國(guó)中元國(guó)際工程有限公司, 北京 100089)
[摘要]莫桑比克莫中文化中心由容納1 500座的大劇場(chǎng)、容納500座的小劇場(chǎng)及中國(guó)文化中心三部分組成,通過(guò)設(shè)置防震縫將結(jié)構(gòu)劃分為三個(gè)獨(dú)立規(guī)則的單體,同時(shí)合理的設(shè)置連廊使三個(gè)結(jié)構(gòu)單元成為一個(gè)有機(jī)的整體。項(xiàng)目地基土濕陷性的特性要求對(duì)基礎(chǔ)進(jìn)行特殊處理,采用后注漿端承摩擦樁,同時(shí)不考慮濕陷性土層的承載力對(duì)基礎(chǔ)進(jìn)行設(shè)計(jì),完全消除濕陷性土對(duì)主體結(jié)構(gòu)的影響,同時(shí)確保結(jié)構(gòu)沉降滿(mǎn)足規(guī)范要求。大劇場(chǎng)屬于大跨度空間結(jié)構(gòu),通過(guò)比選,采用鋼桁架結(jié)構(gòu),同時(shí)對(duì)支承桁架的框架柱及臺(tái)口柱等重要構(gòu)件按照中震彈性的性能目標(biāo)進(jìn)行性能化分析,確保結(jié)構(gòu)安全;懸挑樓座根據(jù)跨度及邊界條件的不同分別采用懸挑梁及懸挑桁架的結(jié)構(gòu)形式,同時(shí)對(duì)懸挑部分進(jìn)行舒適度驗(yàn)算,對(duì)受力復(fù)雜部位進(jìn)行有限元分析,確保結(jié)構(gòu)的安全,同時(shí)達(dá)到經(jīng)濟(jì)、合理的目標(biāo)。
[關(guān)鍵詞]劇場(chǎng)結(jié)構(gòu); 大跨度空間結(jié)構(gòu); 濕陷性地基; 懸挑樓座; 連廊
中圖分類(lèi)號(hào):TU393-3文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2018)21-0060-06
Structure design for Sino Mozambican Cultural Center of Mozambique
Zhang Su, Meng Yongjie, Zhang Yong, Wang Ru, Liu Chong, Zhou Tingyuan
(China IPPR International Engineering Co., Ltd., Beijing 100089, China)
Abstract:Sino Mozambique Cultural Center of Mozambique consists of a 1 500-seat grand theatre, a small 500-seat theater and a Chinese cultural center. The structure is divided into three independent rules by setting the anti-vibration joint, and the reasonable corridor setting makes the three structural units an organic whole. The characteristics of the foundation soil collapsibility of the project require special treatment. The post-grouting end bearing friction pile was adopted, and the foundation was designed without considering the bearing capacity of the collapsible soil layer, which completely eliminating the influence of collapsible soil on the main structure. At the same time, which ensure that the structural settlement meets the requirements of the specification. The grand theater is a large-span spatial structure. Through the comparison, the steel truss structure was adopted, and the important components such as the frame column and the pillar column supporting the truss were analyzed according to the performance objectives of the medium-seismic elastic to ensure the structural safety; According to the different span and boundary conditions, the structure of cantilever beam and cantilever truss were adopted. At the same time, the cantilever part was checked for comfort, and the finite element analysis was carried out on the complicated part to ensure the safety of the structure and at the same time achieve economic and reasonable goals.
Keywords:theatre structure; large span open structure; collapsible soil; overhang seats; corridor
作者簡(jiǎn)介:張速,學(xué)士,高級(jí)工程師,一級(jí)注冊(cè)結(jié)構(gòu)工程師,Email:728239747@qq.com。
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!