- 摘 要
-
(北京市建筑設(shè)計(jì)研究院有限公司, 北京 100045)
[摘要]結(jié)合騰訊(北京)總部大樓超長懸挑、立面開大洞、樓板不連續(xù)、豎向構(gòu)件不連續(xù)、結(jié)構(gòu)轉(zhuǎn)換、空中鋼連橋、大跨樓梯以及項(xiàng)目位于高烈度區(qū)等特點(diǎn),采用鋼筋混凝土核心筒-長懸臂巨型鋼桁架-混凝土框架所組成的結(jié)構(gòu)體系。考慮到結(jié)構(gòu)體系特殊、體型復(fù)雜、嚴(yán)重超限以及工程的重要性,采用了性能化抗震設(shè)計(jì)方法,計(jì)算分析采用多個(gè)程序校核,計(jì)算結(jié)果按多個(gè)模型包絡(luò)設(shè)計(jì),提出了詳細(xì)的設(shè)計(jì)措施。由于超長懸挑結(jié)構(gòu)的特殊性,對懸挑部位的豎向地震作用、不同施工順序帶來的影響、舒適度、結(jié)構(gòu)樓板、關(guān)鍵節(jié)點(diǎn)等進(jìn)行了詳盡的分析。應(yīng)用BIM技術(shù),優(yōu)化了節(jié)點(diǎn)處鋼筋與型鋼連接以及鋼筋之間的穿插關(guān)系。采用天然地基筏形厚板基礎(chǔ)加抗浮小樁方案,有效控制基礎(chǔ)各部分的沉降差異,滿足了工程進(jìn)度要求。
[關(guān)鍵詞]騰訊(北京)總部大樓; 懸挑結(jié)構(gòu); 樓板不連續(xù); 豎向地震作用; 性能化抗震設(shè)計(jì); 舒適度; 施工模擬
中圖分類號(hào):TU318文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2018)20-0035-08
Overview of key technologies for complex structural design of Tencent(Beijing) Headquarters Building
Qi Yue, Guo Chenxi, Shu Weinong , Zhang Chong, Zhang Shuo, Chang Jianwei, Zhang Shuo, Yang Yi
(Beijing Institute of Architectural Design, Beijing 100045, China)
Abstract:Combined with the characteristics of super-long cantilever, large hole in facade, discontinuous floor, discontinuity of vertical members, structural transformation, sky steel bridge, large-span stair and the high seismic intensity, the structural system of Tencent(Beijing) Headquarters Building adopts reinforced concrete corewall\|large cantilever mega steel truss-concrete frame. Considering the special structural system, complex shape, serious out-of-code items and the importance of the project, the performance-based seismic design method was adopted. The calculation and analysis were checked by multiple programs. The calculation results were calculated according to multiple models and the enveloping method was adopted, and the detailed design measures were put forward. Due to the particularity of the super-long cantilever structure, detailed analysis was conducted on the vertical earthquake action of the cantilever part, the influence of different construction orders, comfortability, structural floor and key nodes. BIM technology was used to optimize the connection between reinforcing bar and section steel and interspersed relationship between reinforcing bars. The natural raft thick plate foundation and anti-floating small pile scheme were adopted to effectively control the settlement differences of all parts of the foundation, thus meeting the engineering progress requirements.
Keywords:Tencent(Beijing) Headquarters Building; cantilevered structure; floor discontinuity; vertical seismic action; performance-based seismic design; comfortability; construction simulation
作者簡介:祁躍,學(xué)士,教授級(jí)高級(jí)工程師,Email:qiyue@biad.com.cn。
- 下載地址
-