壓水堆核電機(jī)組安全殼結(jié)構(gòu)自動(dòng)化監(jiān)測(cè)系統(tǒng)開(kāi)發(fā)與應(yīng)用
許凱偉1,榮華2,楊璋3,劉凱2
摘 要

(1 廈門(mén)ABB低壓電氣設(shè)備有限公司, 廈門(mén) 361006;  2 中冶建筑研究總院有限公司, 北京 100088;3 福建寧德核電有限公司, 寧德 355200)

[摘要]鑒于安全殼結(jié)構(gòu)全壽期安全監(jiān)測(cè)要求,針對(duì)目前壓水堆核電機(jī)組安全殼結(jié)構(gòu)原有測(cè)試系統(tǒng)存在的不足,通過(guò)自動(dòng)化技術(shù)實(shí)現(xiàn)安全殼結(jié)構(gòu)內(nèi)混凝土變位、應(yīng)變、溫度等測(cè)量數(shù)據(jù)的實(shí)時(shí)采集,建立了安全殼結(jié)構(gòu)全壽期安全監(jiān)測(cè)系統(tǒng)。該系統(tǒng)已在某在役壓水堆核電機(jī)組安全殼結(jié)構(gòu)中得到應(yīng)用,首次實(shí)現(xiàn)在安全殼結(jié)構(gòu)壓力試驗(yàn)過(guò)程中采集所有測(cè)點(diǎn)完整的響應(yīng)數(shù)據(jù)曲線(xiàn),提升了每個(gè)壓力平臺(tái)的工作效率。該系統(tǒng)既提升了監(jiān)測(cè)精度和時(shí)效,縮短大修關(guān)鍵路徑,又實(shí)現(xiàn)了安全殼結(jié)構(gòu)全壽期的監(jiān)測(cè)功能,為安全殼結(jié)構(gòu)安全評(píng)估提供了寶貴數(shù)據(jù)支撐。

[關(guān)鍵詞]核電廠(chǎng); 安全殼; 安全; 監(jiān)測(cè)系統(tǒng)

中圖分類(lèi)號(hào):TU398-7文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2018)16-0111-03

 

Study and application of safety monitoring system for pressurized water reactor nuclear power plant containment

Xu Kaiwei1, Rong Hua2, Yang Zhang3, Liu Kai2

(1 ABB Xiamen Low Voltage Equipment Co.,  Ltd.,  Xiamen 361006,China; 2 Central Research Institute of Building and Construction Co.,  Ltd.,  Beijing 100088,China; 3 Fujian Ningde Nuclear Power Company, Ningde 355200, China)

Abstract:According to the requirement of the safety monitoring of the pressurized water reactor nuclear power plant and aim at the deficiency of the original measurement system, an automatic monitoring system of the containment structure was established by collecting the data of strain, deformation and temperature of containment concrete, which are obtained by the automatic acquisition technique in real time. The system has been applied in the strength test of an in-service pressurized nuclear power plant containment structure. And the working effectiveness of each pressured platform was improved by realizing the acquisition of the complete response data curve of the measuring points for the first time. This system not only improves the monitoring accuracy and time effectiveness, shortens the inspection key path, but also perfects the containment monitoring system, and provides the invaluable data for the assessment of the concrete structure.

Keywords:nuclear power plant; containment; safety; monitoring system

 

作者簡(jiǎn)介:許凱偉,學(xué)士,助理工程師,Email:xkw1990511@163.com。

下載地址

    你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!