貴陽(yáng)奧體中心主體育場(chǎng)預(yù)應(yīng)力施工技術(shù)研究
曾軍, 周順豪, 王澤強(qiáng),吳源華,葛家琪,付琰
- 摘 要
-
(1 貴陽(yáng)金陽(yáng)建設(shè)投資有限公司,貴陽(yáng) 550001;2 北京市建筑工程研究院,北京 100039;3 中國(guó)航空規(guī)劃建設(shè)發(fā)展有限公司,北京 100120)[摘要]詳細(xì)介紹了貴陽(yáng)奧體中心主體育場(chǎng)整套預(yù)應(yīng)力施工技術(shù)。采取在拉索兩端拉一根鋼絲繩,由一端向另一端滑移的方法完成拉索安裝;采取對(duì)稱分級(jí)的張拉方法,總體上分為3級(jí)張拉完成,第1級(jí)張拉完成后拆除支撐,而后進(jìn)行第2和第3級(jí)預(yù)應(yīng)力張拉。實(shí)踐證明,方案技術(shù)上合理,降低了施工成本。使用有限元計(jì)算軟件MIDAS,對(duì)預(yù)應(yīng)力施工過(guò)程進(jìn)行了詳細(xì)的仿真計(jì)算分析,計(jì)算結(jié)果表明,張拉過(guò)程中拉索索力相互影響比較小,卸載完成后,結(jié)構(gòu)豎向位移變化較大,張拉完成后,結(jié)構(gòu)豎向位移最大變化為63mm,說(shuō)明預(yù)應(yīng)力施加對(duì)結(jié)構(gòu)豎向變形起到一定控制作用。設(shè)計(jì)了詳細(xì)的施工和安全監(jiān)測(cè)方案,監(jiān)測(cè)數(shù)據(jù)表明索力、結(jié)構(gòu)豎向位移、構(gòu)件內(nèi)力與仿真計(jì)算分析的偏差都在一個(gè)較合理的范圍之內(nèi),以索力控制為主控參數(shù),豎向位移為第2控制參數(shù),并綜合考慮構(gòu)件內(nèi)力,確認(rèn)施工張拉已經(jīng)達(dá)到設(shè)計(jì)及相關(guān)驗(yàn)收標(biāo)準(zhǔn)要求。[關(guān)鍵詞] 大懸挑預(yù)應(yīng)力鋼結(jié)構(gòu);仿真計(jì)算;施工監(jiān)測(cè);施工技術(shù)Study on prestressing construction technology of the main stadium in Guiyang Olympic Sports CenterZeng Jun1, Zhou Shunhao2, Wang Zeqiang2, Wu Yuanhua2, Ge Jiaqi3, Fu Yan1(1 Guiyang Jinyang Construction Investment Co., Ltd., Guiyang 550001, China; 2 Beijing Building Construction ResearchInstitute, Beijing 100039, China; 3 China Aviation Planning and Construction Development Co., Ltd., Beijing 100120, China)Abstract:The prestressing construction technology of the main stadium in Guiyang Olympic Sports Center was introduced. The cables were installed by the steel wire which was from one end to the other end of the cable. Adopting symmetrical classification method, the cables were tensioned in three steps. The support was moved after the first step was finished. Then the second and third steps were carried out. Practice has proved that the technology is reasonable and the cost of construction is reduced. Using MIDAS software, the simulation analysis of prestressing construction process was carried out. It shows from the result that the cable force is little affecting each other in course of tension. After the support is moved, the vertical displacement is very big. And the change of vertical displacement is about 63mm after the prestressing is finished. It shows that the prestressing plays a certain role in vertical deformation control. The monitoring plan of construction and security was finished. The monitor data show that the cable force, displacement and steel stress are all in reasonable range.With the cable tension as the main control parameter and the vertical displacement as the second control parameter and the stress of steel being taken into account simultaneously, the cable tensioning has reached the design and criteria requirement.Keywords:large cantilever prestressed steel structure; simulation calculation; construction monitoring; construction technology貴州省科技廳工業(yè)攻關(guān)項(xiàng)目([2010]3002),貴陽(yáng)市科技局工業(yè)攻關(guān)項(xiàng)目[2010]。作者簡(jiǎn)介:曾軍,碩士,高級(jí)工程師,副總經(jīng)理,Email:zjj0521@163.com。參考文獻(xiàn)[1]黃明鑫. 大型張弦梁結(jié)構(gòu)的設(shè)計(jì)與施工[M]. 山東:山東科學(xué)技術(shù)出版社,2005.[2]王澤強(qiáng),秦杰,許曙東,等. 青島國(guó)際帆船中心預(yù)應(yīng)力施工技術(shù)[J]. 施工技術(shù),2007,36(11):14-16.[3]徐瑞龍,秦杰,李國(guó)立,等. 國(guó)家?jiàn)W林匹克體育中心綜合訓(xùn)練館張弦結(jié)構(gòu)施工技術(shù)[J]. 工業(yè)建筑,2007,37(1):26-29.[4]秦杰,王澤強(qiáng),張然,等. 2008奧運(yùn)會(huì)羽毛球館預(yù)應(yīng)力施工監(jiān)測(cè)研究[J]. 建筑結(jié)構(gòu)學(xué)報(bào),2007,28(6):83-91.[5]張愛(ài)林,劉學(xué)春,王冬梅,等. 2008奧運(yùn)會(huì)羽毛球館新型預(yù)應(yīng)力弦支穹頂結(jié)構(gòu)全壽命健康監(jiān)測(cè)研究[J]. 建筑結(jié)構(gòu)學(xué)報(bào),2007,28(6):92-99.
[6]葛家琪,周順豪,谷鵬,等.貴陽(yáng)奧體中心主體育場(chǎng)罩篷鋼結(jié)構(gòu)預(yù)應(yīng)力張拉施工仿真分析研究[J].建筑結(jié)構(gòu),2010,40(12):49-55.
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!