- 摘 要
-
(廣東省建筑設(shè)計(jì)研究院, 廣州 510010)
[摘要]廣州新白云國際機(jī)場T2航站樓為國內(nèi)大型樞紐機(jī)場,國家重點(diǎn)工程。航站樓鋼屋蓋面積約為25萬m2,下部結(jié)構(gòu)為鋼筋混凝土框架結(jié)構(gòu),上部屋蓋結(jié)構(gòu)體系為網(wǎng)架結(jié)構(gòu),主樓采用加肋網(wǎng)架并局部采用抽空處理。航站樓結(jié)構(gòu)超長,平立面布置復(fù)雜,屋蓋形狀為自由曲面,針對(duì)結(jié)構(gòu)設(shè)計(jì)中遇到的如柱頂支座節(jié)點(diǎn)、與鋼管混凝土柱連接的雙梁節(jié)點(diǎn)等關(guān)鍵技術(shù)問題,采取了相應(yīng)的技術(shù)措施。分析結(jié)果表明,結(jié)構(gòu)具有可靠的受力性能。
[關(guān)鍵詞]廣州新白云國際機(jī)場; 航站樓; 鋼屋蓋; 加肋網(wǎng)架; 自由曲面
中圖分類號(hào):TU393.3文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2016)21-0064-06
Steel roof structure design of T2 terminal of Guangzhou New Baiyun International Airport
Zhang Lianfei, Ou Tong, Tan Jian, Chen Xing
(Architectural Design and Research Institute of Guangdong Province,Guangzhou 510010,China)
Abstract:T2 terminal of Guangzhou New Baiyun International Airport is one of large scale transports and important projects in China. The area of the whole steel roof of the terminal is about 250 000m2. Steel concrete frame structure is adopted as lower-part structure. The upper steel roof adopts space truss structure. The ribbed space truss is used in the main building of terminal with partial member removal. The terminal is super long and has complex plane and elevation, the roof is free-form surface. According to many key design problems,such as support joints on the top of the column, double beam joints connected with concrete-filled steel tubular columns,corresponding technical measures were adopted. Analysis results show that the structure has reliable performances.
Keywords:Guangzhou New Baiyun International Airport;terminal;steel roof;ribbed space truss; free-form surface
作者簡介:張連飛,碩士,工程師,Email:445337551@qq.com。
- 下載地址
-
你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!