884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2016年>> 第21期>>正文內(nèi)容
保利國際廣場二期結(jié)構(gòu)設(shè)計
譚堅,區(qū)彤,張連飛
摘 要

(廣東省建筑設(shè)計研究院, 廣州 510010)

[摘要]保利國際廣場二期為帶巨型轉(zhuǎn)換桁架的框架-剪力墻超限結(jié)構(gòu),4個剪力墻筒沿結(jié)構(gòu)周邊布置,巨型轉(zhuǎn)換桁架位于結(jié)構(gòu)3層,并在結(jié)構(gòu)2~4層剪力墻中設(shè)置鋼板形成鋼板剪力墻形式。介紹了結(jié)構(gòu)體系、設(shè)計條件,并對結(jié)構(gòu)受力特點及超限情況進行闡述。對風荷載及小震、中震、大震作用下的結(jié)構(gòu)及構(gòu)件進行分析,分析結(jié)果表明,采取合理的措施和對策,結(jié)構(gòu)能夠滿足設(shè)定的抗震性能目標。最后對巨型鋼轉(zhuǎn)換桁架進行防火設(shè)計,確定砂漿厚度。

[關(guān)鍵詞]轉(zhuǎn)換桁架; 鋼板剪力墻; 超限分析; 樓板應力分析; 防火設(shè)計

中圖分類號:TU398-7, TU318文獻標識碼:A文章編號:1002-848X(2016)21-0037-09

 

Structural design of Second Phase Project for Poly International Plaza

Tan Jian, Ou Tong, Zhang Lianfei

(Architectural Design and Research Institute of Guangdong Province, Guangzhou 510010, China)

Abstract:The Second Phase Project for Poly International Plaza is a frame-shear wall out-of-code structure with mega conversion truss. Four shear wall tubes are disposed along the periphery of the structure. Mega conversion truss is located in the third structural floor and the steel plates are set in shear walls of the second, the third and fourth structural floors to form steel plate shear wall structural system. The structural system and design conditions were introduced, and structural mechanism characteristics and out-of-code conditions were illustrated. The structure and opponents were analyzed under wind loads and frequent, fortification and rare earthquakes. Analysis results show that  adopted reasonable measures can make structure  meet expected seismic fortification goals. The fire protection design of mega steel conversion truss was conducted to determine the mortar thickness.

Keywords:conversion truss; steel plate shear wall; out-of-code analysis; floor stress analysis; fire protection design

 

作者簡介:譚堅,碩士,高級工程師,副總工程師,Email: 32272872@qq.com。

下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點此注冊吧!

    如果你已經(jīng)注冊但還沒登錄,請趕緊點此登錄吧!