[摘要]鄭東新區(qū)龍湖金融中心某辦公樓采用框架-核心筒結(jié)構(gòu)體系,樓板、屋蓋采用現(xiàn)澆混凝土空心樓蓋技術(shù)。重點介紹了該項目的地基基礎(chǔ)設(shè)計、結(jié)構(gòu)體系及方案選擇、空心樓板設(shè)計及構(gòu)造詳圖、寬扁梁柱節(jié)點構(gòu)造等幾個方面?,F(xiàn)澆空心樓蓋采用填充箱與輕質(zhì)管作為填充體,400mm厚空心樓板的空心率達到46-8%,介紹了空心樓板配筋計算及撓度驗算。
[關(guān)鍵詞]結(jié)構(gòu)體系; 現(xiàn)澆混凝土空心樓蓋; 寬扁梁; 充填體; 節(jié)點核心區(qū)構(gòu)造
中圖分類號:TU318, TU393-3文獻標識碼:A文章編號:1002-848X(2016)19-0094-05
Structural design of an office building in Longhu Financial Center in Zhengdong New District
Bai Mei, Bai Shuyang, Liu Guoyou
(China Institute of Building Standard Design & Research, Beijing 100048, China)
Abstract:An office building in Longhu Financial Center in Zhengdong New District adopts frame-corewall structural system. The floor and roof adopt cast-in-situ concrete hollow floor technology. The foundation design, structural system and scheme selection, hollow floor design and construction detail, and connection structure of column-slim beam were introduced in detail. The cast-in-situ hollow slab uses packing box and light pipe as the filler and the volumetric void ratio of 400mm thick hollow floor reached 46-8%. The calculation of reinforcement and deflection of the hollow floor were introduced.
Keywords:structural system; cast-in-site concrete hollow floor; slim beam; filler; core area structure