- 摘 要
-
(上海城建市政工程(集團(tuán))有限公司, 上海 200065)
[摘要]上海某區(qū)間隧道穿越-1400mm上水管,通過(guò)優(yōu)化切口水壓、推進(jìn)速度、糾偏量、泥水性能、干砂量、同步注漿和二次補(bǔ)漿等施工參數(shù),盾構(gòu)穿越后上水管累積沉降量控制在±10mm以內(nèi),為類似工程提供了借鑒。
[關(guān)鍵詞]泥水盾構(gòu); 穿越上水管; 施工參數(shù)
中圖分類號(hào): TU457 文獻(xiàn)標(biāo)識(shí)碼: A文章編號(hào): 1002-848X(2016)S1-0867-04
Construction control of the tunnel shield in complex stratum which cross the water-supply line
Shen Xia
(Shanghai Urban Construction Municipal Engineering (Group) Co., Ltd., Shanghai 200065, China)
Abstract: Shanghai subway tunnel crossing -1400mm water-supply line, through optimizing the cut pressure, driving speed, deviation, slurry quantity, dry sand content, synchronous grouting and secondary grouting quantity, pipe subsidence has be controlled at about 10 mm after shield crossing, this will be a reference for similar project.
Keywords: slurry shield; through the water-supply line; construction parameter
作者簡(jiǎn)介:沈霞,本科,工程師,Email:769260186@qq.com。