- 摘 要
-
(河北建筑設計研究院有限責任公司上海公司, 上海 200125)
[摘要]該酒店由防震縫分成主樓和左、右裙房三部分。主樓為21層框架-剪力墻結(jié)構(gòu),左、右裙房為3層框架結(jié)構(gòu),均設有1層地下室且地下室連為整體,樁筏基礎。本文介紹了基礎設計、結(jié)構(gòu)體系布置、計算分析及設計難點等內(nèi)容,為其他工程提供參考。
[關鍵詞]框架-剪力墻結(jié)構(gòu); 錯層; 大跨框架; 井字梁; 嵌固端
中圖分類號: TU318,TU375 文獻標識碼: A文章編號: 1002-848X(2016)S1-0132-05
Structural design of Dahua Jinxiu Holiday Inn
Wang Jiandong, Xu Ning
(Shanghai Branch, Hebei Architectural Design & Research Institute Co., Ltd., Shanghai 200125, China)
Abstract: The building was divided into a main building, left annex and right annex by seismic joint. The main building is a 21-layer frame-shearwall structure, the two annexes are 3-layer frame structures, they are all over a large 1-layer basement with pile-raft foundation. Design of foundation and structure layout were presented, calculation index and some design difficulties were introduced.
Keywords: frame-shearwall structure; staggered floor; long-span frame; cross beam; fixed point
作者簡介: 王建東,碩士,教授級高級工程師,一級注冊結(jié)構(gòu)工程師,Email:wjdyhj@126.com。