廣州新客站結(jié)構(gòu)總體設(shè)計(jì)
盛平1,柯長華1,甄偉1,王軼1,高昂1,徐福江1,趙明1,陳強(qiáng)2,沈婷2
摘 要
(1 北京市建筑設(shè)計(jì)研究院, 北京100045; 2 中鐵第四勘察設(shè)計(jì)院有限公司, 武漢 430063)
[摘要]廣州新客站鐵路樞紐采用站橋合一的結(jié)構(gòu)體系,總平面尺寸525m×586m,建筑面積56萬m2,地下1層,地上3層。首層為地面停車場,屬于室外廣場;層2為鐵路站臺層,采用線性結(jié)構(gòu)為主的預(yù)應(yīng)力鋼筋混凝土結(jié)構(gòu),中部采用跨度64m的拱形結(jié)構(gòu),平行軌道方向共設(shè)置9道伸縮縫;層3候車室為鋼筋混凝土框架結(jié)構(gòu),其柱子部分落在橋梁上,部分落在橋墩上, 平行軌道方向共設(shè)置2道伸縮縫。屋蓋采用新型大跨度預(yù)應(yīng)力空間鋼結(jié)構(gòu),主站房屋頂為476m×222m,在屋面與兩側(cè)的無站臺雨棚設(shè)置了伸縮縫。各層結(jié)構(gòu)體系、剛度、質(zhì)量等相差較大,介紹了各層結(jié)構(gòu)特點(diǎn)、相互關(guān)系及其結(jié)構(gòu)布置等。
[關(guān)鍵詞]火車站;站橋合一;拱形結(jié)構(gòu);候車室;預(yù)應(yīng)力;鋼結(jié)構(gòu)
Overall structure design of New Guangzhou Railway Station
Sheng Ping1, Ke Changhua1, Zhen Wei1, Wang Yi1, Gao Ang1, Xu Fujiang1, Zhao Ming1, Chen Qiang2, Shen Ting2 (1 Beijing Institute of Architectural Design, Beijing 100045, China;2 The Fourth Survey and Design Institute of China Railways, Wuhan 430063, China)
Abstract:Bridge-station combined structure system is applied in New Guangzhou Railway Station, which is the main building of New Guangzhou Railway Center. The plan dimension is about 525m×586m and the area is 0.56 million square meters. There is one floor underground and three floors overground. The ground floor is parking. The second floor is railway platform, which consists of one dimensional prestress reinforced concrete frame structure and 64m-span arc structure. The third floor is waiting room, which consists of prestress reinforced concrete frame structure, and the columns are supported on bridges or piers. The plan dimension of main station roof consisting of long-span prestress spatial system is 476m×222m, which is separated with canopy roof by aseismic joint. There are 9 aseismic joints in the second floor and 2 in the third floor. The mass and stiffness are greatly different in different floors. The structure system character, interrelation and arrangement are thoroughly introduced.
Keywords: railway station;bridge-station combined system; arc structure; waiting room; prestress; steel structure
作者簡介:盛平,碩士,教授級高工,Email:Shengp@biad.com.cn。
參考文獻(xiàn)
[1]盛平,柯長華,等.一種新型預(yù)應(yīng)力索拱結(jié)構(gòu)設(shè)計(jì)及工程應(yīng)用[J].建筑結(jié)構(gòu),2008,38(1).
[2]中國建筑科學(xué)研究院.新廣州火車站風(fēng)荷載與風(fēng)環(huán)境試驗(yàn)研究報(bào)告[R].2008.
[3]廣東省工程防震研究院. 新廣州站及相關(guān)工程場地地震安全性評價(jià)報(bào)告[R].2005.
[4]安妮特·博格勒,等. 輕·遠(yuǎn)-德國約格·施萊希和魯?shù)婪?middot;貝格曼德輕型結(jié)構(gòu)[M]. 北京:中國建筑工業(yè)出版社,2004.
[5]沈世釗,等. 懸索結(jié)構(gòu)設(shè)計(jì)[M]. 北京:中國建筑工業(yè)出版社,1997.
[6]北京邁達(dá)斯公司. MIDAS理論手冊[M]. 2004.

[7]ANSYS公司. ANSYS非線性分析手冊[M]. 2002.