對(duì)《砌體結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》(GB 50203—2011)第9.2.3條的兩點(diǎn)商榷
楊保昌1,束拉2,蔣曉東2
- 摘 要
-
(1 河南建達(dá)工程建設(shè)監(jiān)理公司,鄭州 450002; 2 鄭州大學(xué)土木工程學(xué)院,鄭州 450001)
[摘要]《砌體結(jié)構(gòu)工程施工質(zhì)量驗(yàn)收規(guī)范》(GB 50203—2011)在第9.2.3條增加了對(duì)填充墻的后植拉結(jié)筋進(jìn)行現(xiàn)場非破壞性試驗(yàn)的規(guī)定,但該規(guī)定存在不嚴(yán)謹(jǐn)、不合理的問題。結(jié)合4本相關(guān)規(guī)范、規(guī)程的相關(guān)條文,對(duì)第9.2.3條修訂不嚴(yán)謹(jǐn)、不合理的兩個(gè)方面提出一些意見。[關(guān)鍵詞]化學(xué)植筋; 后錨固; 帶肋鋼筋; 拉拔試驗(yàn)中圖分類號(hào):TU365 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1002-848X(2015)12-0081-02
Two discussions of 9.2.3 article of Code for acceptance of constructional quality of masonry structures (GB 50203—2011)Yang Baochang1, Shu La2, Jiang Xiaodong2(1 Henan Jianda Engineering Consultants Company, Zhengzhou 450002, China; 2 School of Civil Engineering, Zhengzhou University, Zhengzhou 450001, China)Abstract: The nondestructive test on site for planted rebar of infilled wall is added in 9.2.3 article of Code for acceptance of constructional quality of masonry structures (GB 50203—2011), but the article is not rigorous and unreasonable. Combined with relevant articles in four relevant codes and specifications, recommendations were provided for the two questions in 9.2.3 article.Keywords:chemically-planted rebar; post anchoring; ribbed rebar; pull-off test
作者簡介:楊保昌,學(xué)士,高級(jí)工程師,一級(jí)建造師,注冊監(jiān)理工程師,Email:40348118@qq.com。
- 下載地址
-