- 摘 要
-
(中國航空工業(yè)規(guī)劃設(shè)計研究院,北京 100011)
[摘要]闡述了湖州垃圾焚燒發(fā)電工程主廠房的結(jié)構(gòu)方案選擇、計算軟件應(yīng)用、垃圾儲存池設(shè)計、混凝土結(jié)構(gòu)超長無縫施工技術(shù)、地基基礎(chǔ)設(shè)計等問題,論述了垃圾焚燒發(fā)電廠主廠房結(jié)構(gòu)的特點及設(shè)計要點。
[關(guān)鍵詞]垃圾焚燒發(fā)電廠;垃圾儲存池;超長無縫施工技術(shù);SATWE
Structural design of Huzhou power project by incinerating refuse
Gao Zongrui, Tang Xiaojun, Zhu Dan(China Aeronautical Project & Design Institute, Beijing 100011, China)
Abstract:Design of Huzhou power project by incinerating refuse, such as the selection of structural scheme for the main plant, use of the structure calculation software, design of refuse bunker, non-joint construction technique as to the over-length concrete structure, subsoil treatment and foundation design, is introduced and expounded. The features and essentials of structural design in the main plant are discussed by illustrating its specific engineer design.
Keywords:power plant by incinerating refuse; refuse bunker; over-length and non-joint construction technique; SATWE
作者簡介:高宗瑞,高級工程師,Email:13011088598@m165.com。
參考文獻
[1]GB50010—2002混凝土結(jié)構(gòu)設(shè)計規(guī)范[S].北京:中國建筑工業(yè)出版社,2002.
[2]GB50011—2001建筑抗震設(shè)計規(guī)范[S].北京:中國建筑工業(yè)出版社,2001.
[3]GB50017—2003鋼結(jié)構(gòu)設(shè)計規(guī)范[S].北京:中國計劃出版社,2003.
[4]曾華榮.破碎帶地基基礎(chǔ)分析處理[J].西部探礦工程,1997,9(6).
[5]王鐵夢.工程結(jié)構(gòu)裂縫控制[M].北京:中國建筑工業(yè)出版社,1997.