884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2009年>> 第03期>>正文內(nèi)容
哈爾濱某地下游泳館預(yù)應(yīng)力混凝土結(jié)構(gòu)設(shè)計(jì)中的若干問(wèn)題
齊岳,王英,鄭文忠
摘 要

(哈爾濱工業(yè)大學(xué)土木工程學(xué)院,哈爾濱 150090)
[摘要]哈爾濱某地下游泳館采用預(yù)應(yīng)力混凝土結(jié)構(gòu)??紤]到游泳館頂蓋上廣場(chǎng)綠化區(qū)和允許消防車通行的道路區(qū)荷載差異較大,分荷載區(qū)域?qū)︻A(yù)應(yīng)力混凝土框架進(jìn)行了設(shè)計(jì)計(jì)算。考慮到由于留設(shè)了后澆帶,結(jié)構(gòu)在施工階段和使用階段的計(jì)算模型不同,對(duì)結(jié)構(gòu)內(nèi)力的計(jì)算方法進(jìn)行了說(shuō)明。結(jié)合工程介紹了預(yù)應(yīng)力混凝土梁及框架柱的計(jì)算方法,著重對(duì)框架梁中附加受壓鋼筋的確定、預(yù)應(yīng)力混凝土梁變形的驗(yàn)算、預(yù)應(yīng)力筋張拉方案、柱縱筋與預(yù)應(yīng)力筋的位置關(guān)系、兩梁相交處非預(yù)應(yīng)力縱筋的布置方法、預(yù)應(yīng)力工藝選擇及灌漿處理、后澆帶處梁頂非預(yù)應(yīng)力縱筋的布置及錨頭構(gòu)造等問(wèn)題進(jìn)行了論述,可供同類工程參考。
[關(guān)鍵詞]預(yù)應(yīng)力混凝土;框架;內(nèi)力計(jì)算;施工方案
Some noteworthy problems in design of prestressed concrete structures in an underground natatorium in Harbin
Qi Yue,  Wang Ying,  Zheng Wenzhong(School of Civil Engineering, Harbin Institute of Technology, Harbin 150090, China)
Abstract:The prestressed concrete structure is adopted in an underground natatorium in Harbin. Considering the load on virescence region differs greatly from the one on the fire engine region on the roof, the prestressed concrete frame is designed and calculated respectively corresponding to different load regions. The calculation model of structure is different in construction stage and serviceability stage due to placing of post-pouring belt, therefore, the calculation method for the internal force of structure is explained. Combine with this project, the calculations method for prestressed concrete beam and frame column are introduced. Some problems frequently occurring in design and construction in actual projects are emphasized such as determination of compressive steel bar, checking on deformation of prestressed concrete beam, tension scheme of prestressed steel, position of longitudinal steel bar and prestressed steel in column, arrangement method of non-prestressed longitudinal steel bar in the region of crossing of two beams, prestress technics and grouting processing, arrangement of non-prestressed longitudinal steel in post-pouring belt and construction of anchorage on the end of beam. All these can be served as reference in construction of the similar projects.
Keywords:prestressed concrete; frame; calculation of internal force; construction scheme
*教育部新世紀(jì)優(yōu)秀人才支持計(jì)劃資助項(xiàng)目(教計(jì)司2005[290]號(hào))。
作者簡(jiǎn)介:齊岳,博士研究生,Email: qiyue0451@126.com。
參考文獻(xiàn)
[1]GB50010—2002混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范[S].
[2]GB50009—2001建筑結(jié)構(gòu)荷載規(guī)范[S].
[3]鄭文忠,王英.預(yù)應(yīng)力混凝土房屋結(jié)構(gòu)設(shè)計(jì)統(tǒng)一方法與實(shí)例[M].哈爾濱:黑龍江科學(xué)技術(shù)出版社,1998.
[4]鄭文忠,許名鑫,王英.哈爾濱市迎賓路地下車庫(kù)預(yù)應(yīng)力大梁設(shè)計(jì)[J].哈爾濱工業(yè)大學(xué)學(xué)報(bào),2004,36(1):36-38.
[5]鄭文忠,趙軍衛(wèi).黑龍江建筑職業(yè)技術(shù)學(xué)院主樓預(yù)應(yīng)力疊層空腹剛架轉(zhuǎn)換結(jié)構(gòu)設(shè)計(jì)[J].建筑結(jié)構(gòu),2006,36(9).
[6]JGJ140—2004預(yù)應(yīng)力混凝土結(jié)構(gòu)抗震設(shè)計(jì)規(guī)程[S].
[7]鄭文忠,解恒燕.預(yù)應(yīng)力混凝土結(jié)構(gòu)設(shè)計(jì)中應(yīng)注意的若干問(wèn)題[J].建筑結(jié)構(gòu),2007,37(6).
[8]杜拱辰.現(xiàn)代預(yù)應(yīng)力混凝土結(jié)構(gòu)[M].北京:中國(guó)建筑工業(yè)出版社,1988.
[9]陶學(xué)康.后張預(yù)應(yīng)力混凝土設(shè)計(jì)手冊(cè)[M].北京:中國(guó)建筑工業(yè)出版社,1996.

下載地址

    你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!