884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2016年>> 第02期>>正文內(nèi)容
超高層建筑樁筏基礎(chǔ)筏板彎矩時變效應(yīng)分析
趙昕 袁聚云 劉射洪
摘 要

趙昕12,袁聚云34,劉射洪34

1 同濟(jì)大學(xué)建筑工程系, 上海 200092; 2 同濟(jì)大學(xué)建筑設(shè)計研究院(集團(tuán))有限公司, 上海 200092;

3 同濟(jì)大學(xué)地下建筑與工程系, 上海 200092; 4 同濟(jì)大學(xué)巖土及地下工程教育部重點實驗室, 上海 200092

[摘要]在超高層建筑結(jié)構(gòu)與地基基礎(chǔ)共同作用過程中,材料、結(jié)構(gòu)及荷載均是時變的。結(jié)合工程實例,從地基沉降的時變性規(guī)律及上部結(jié)構(gòu)的時變性規(guī)律出發(fā),采用以時間切片的形式考慮時變效應(yīng)的分析方法,通過PLAXISETABS軟件分析超高層建筑地基-基礎(chǔ)-上部結(jié)構(gòu)共同作用體系的時變性對樁筏基礎(chǔ)筏板彎矩的影響。分析結(jié)果表明,對于高500m以上的超高層建筑,這種影響在工程允許范圍之內(nèi),即傳統(tǒng)計算方法的一次加載分析就能滿足筏板彎矩的計算精度要求。

[關(guān)鍵詞]超高層建筑; 時變性沉降; 施工過程; 共同作用; 筏板彎矩

中圖分類號:TU470文獻(xiàn)標(biāo)識碼:A文章編號:1002-848X(2016)02-0065-06

Time-dependent raft bending moment analysis for pile-raft foundation of super tall buildings

Zhao Xin1, 2, Yuan Juyun3, 4, Liu Shehong3, 4

1 Department of Structural Engineering, Tongji University, Shanghai 200092, China;

2 Tongji Architectural Design (Group) Co., Ltd., Shanghai 200092, China; 3 Department of Geotechnical Engineering,

Tongji University, Shanghai 200092, China; 4 Key Laboratory of Geotechnical and Underground Engineering of the

Ministry of

Education, Tongji University, Shanghai 200092, China

Abstract:In the interaction process between superstructure and foundation for super tall buildings, materials, structures and loads are all time-dependent. Combined with engineering project and based on the time-dependent features of settlement and superstructure, time-slicing analysis approach was used to consider the time-dependent effects. Influence of time-dependent of integrated system of super tall building ground-foundation-superstructure on raft bending moment of pile-raft foundation was carried out by software PLAXIS, ETABS. The analysis results show that the bending moment differences in super tall buildings raft caused by the time-dependent effect are within permissible range of engineering practice for the super tall buildings over 500m. The once-loading analysis in traditional calculation method can meet the calculation accuracy requirements of the raft bending moment.

Keywords:super tall building; time-dependent settlement; construction sequence; interaction; raft bending moment

*上海市優(yōu)秀技術(shù)帶頭人計劃(14XD1423900),上海市科技攻關(guān)計劃(09dz1207704)。

 

作者簡介:趙昕,博士,高級工程師,碩士研究生導(dǎo)師,Email: 22zx@ tjadri.com

下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點此注冊吧!

    如果你已經(jīng)注冊但還沒登錄,請趕緊點此登錄吧!