- 摘 要
-
(1 浙江大學(xué)建筑設(shè)計研究院,杭州 310027; 2 浙江大學(xué)空間結(jié)構(gòu)中心,杭州 310058;3 上海奧順置業(yè)有限公司,上海 200001)
[摘要]嵊泗海洋文化中心是嵊泗縣“十一五”期間的重點項目之一,層2看臺采用大跨度鋼結(jié)構(gòu)曲梁結(jié)構(gòu)形式。著重分析了大跨度曲梁節(jié)點設(shè)計及先約束后放松支座施工技術(shù),利用MIDAS軟件建模模擬了大跨度曲梁看臺的工作性狀。鑒于主體結(jié)構(gòu)已施工,分區(qū)吊裝、現(xiàn)場拼接給結(jié)構(gòu)設(shè)計造成了更多困難。通過該項目的介紹可為此類大跨度鋼結(jié)構(gòu)的設(shè)計、施工提供有益經(jīng)驗。
[關(guān)鍵詞]大跨度鋼結(jié)構(gòu)曲梁;先約束后放松;有限元
Structural design of theater platform in Shengsi Ocean Cultural Center
Xu Xiaohong1, Zhang Jie1, Yu Zuguo1, Gao Boqing2, Liu Guoguang2,3(1 Architectural Design and Research Institute of Zhejiang University, Hangzhou 310027, China; 2 Spatial Structure Centre of Zhejiang University, Hangzhou 310058, China; 3 Shanghai Aoshun Real Estate Company, Shanghai 200001, China)
Abstract:Shengsi Ocean Cultural Center is the important project of Shengsi County during “the 11th Five-year Plan”, which adopts large span steel structure system. The working condition of large span curved beams is analyzed by MIDAS. The methods of large span curved beam about detailed design and slackening after restraint to belts are discussed. Due to the main structure is almost completed, suspension setting and splice in subzone put forward high requirements to structure design. The experience deduced could be useful in other similar large span projects.
Keywords:large span curved beam; slackening after restraint; FEM
作者簡介:徐曉紅,碩士,一級注冊結(jié)構(gòu)工程師,Email:xuxh@zuadr.com。
參考文獻
[1]SCHLAICH J, et al. Design and detailing of structural concrete using strut-nd-ie models[J]. The Structural Engineer, 1991, 69(6).
[2]GB50010—2002混凝土結(jié)構(gòu)設(shè)計規(guī)范[S].北京:中國建筑工業(yè)出版社,2002.
[3]GB50011—2001建筑抗震設(shè)計規(guī)范[S].北京:中國建筑工業(yè)出版社,2002.
[4]GB50017—2003鋼結(jié)構(gòu)設(shè)計規(guī)范[S].北京:中國計劃出版社,2003.