- 摘 要
-
(同濟(jì)大學(xué)建筑設(shè)計(jì)研究院(集團(tuán))有限公司, 上海 200092)
[摘要]矩形頂管通常在接收井內(nèi)進(jìn)洞,無接收井情況下的案例較少,而在運(yùn)營中的地下室進(jìn)洞更是罕有先例,本文通過一個(gè)運(yùn)營地下室無接收井條件下進(jìn)洞的案例,分析此類情況下的設(shè)計(jì)施工要點(diǎn)。
[關(guān)鍵詞]矩形頂管; 無接收井; 運(yùn)營地下室
中圖分類號(hào): TU354 文獻(xiàn)標(biāo)識(shí)碼: A 文章編號(hào): 1002-848X(2015)S2-0200-04
Analysis on key points of rectangular pipe jacking into the hole without
receiving well in the operating basement
Huang Bin
(Tongji Architectural Design (Group) Co., Ltd., Shanghai 200092, China)
Abstract: Rectangular pipe jacking usually in receiving well into the hole, few cases without receiving well, and in the operating basement is rare precedent. Through a operating basement without receiving well case, key points in the design and construction of such cases were analyzed.
Keywords: rectangular pipe jacking; without receiving well; in the operating basement
作者簡(jiǎn)介:黃斌,碩士,工程師,Email:huangbintj@163.com。
- 下載地址
-
你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!