蘇州國(guó)際博覽中心卸貨區(qū)鋼結(jié)構(gòu)桁架設(shè)計(jì)
戴雅萍,趙宏康,陳磊
- 摘 要
-
(蘇州市建筑設(shè)計(jì)研究院有限責(zé)任公司,蘇州 215002)[摘要]主要介紹了蘇州國(guó)際博覽中心4#展廳卸貨區(qū)鋼結(jié)構(gòu)桁架結(jié)構(gòu)設(shè)計(jì)。通過(guò)利用設(shè)備層層高和合理的桁架構(gòu)件設(shè)置,充分發(fā)揮了鋼結(jié)構(gòu)巨型平面桁架桿件軸心受力的優(yōu)勢(shì)和平面內(nèi)的巨大剛度。為有大跨和重荷要求的結(jié)構(gòu)設(shè)計(jì)提供了參考。[關(guān)鍵詞]展廳卸貨區(qū);鋼結(jié)構(gòu)桁架;軸心受力;剛度Design of steel truss in loading dock area of Suzhou Expo CenterDai Yaping, Zhao Hongkang, Chen Lei(Suzhou Institute of Architecture Design Co., Ltd., Suzhou 215002, China)Abstract:The design of structure truss in 4# loading dock area of Suzhou Expo Center is introduced. By making use of the mezzanine height of central mechanical/electrical plan and setting reasonably the member shape of steel truss, steel truss in supporting axial force and large stiffness in truss plan are taken advantage, which may be a reference for the design of the structures having large span and supporting heavy load.Keywords:loading dock; exhibition hall; steel truss; axial force; stiffness作者簡(jiǎn)介:戴雅萍,碩士,教授級(jí)高工。參考文獻(xiàn)[1]GB50009—2001建筑結(jié)構(gòu)荷載規(guī)范[S].[2]American-Institute of Steel Construction. AISC Manual of steel Construction, Load and Resistance Factor Design[M]. 2001.[3]ASCE standard ANSI/ASCE 7-02,Minimum Design Load of Building[S].[4]戴雅萍,趙宏康.蘇州國(guó)際博覽中心鋼結(jié)構(gòu)樓面設(shè)計(jì)[J].鋼結(jié)構(gòu),2005,20(6).[5]趙宏康,戴雅萍.蘇州國(guó)際博覽中心標(biāo)準(zhǔn)展廳地震反應(yīng)分析[J].建筑結(jié)構(gòu),2007,37(2).[6]GB50017—2003鋼結(jié)構(gòu)設(shè)計(jì)規(guī)范[S].
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!