地鐵換乘樞紐旁深大基坑的若干設計技術分析
謝小林,翟杰群,賈堅
- 摘 要
-
(同濟大學建筑設計研究院,上海 200092)[摘要]結合緊鄰地鐵換乘樞紐開發(fā)建設的大型地下空間綜合體工程的設計實踐,對該類工程深大基坑設計的技術難點進行了歸納,并針對這些設計技術難點總結提出了三維有限元建模分析、圍護結構共墻設計計算以及深大基坑降承壓水對周邊環(huán)境影響的預估分析的設計計算思路及方法,為地鐵換乘樞紐旁深大基坑的設計和施工提供參考和借鑒。[關鍵詞]地鐵換乘樞紐;?深大基坑;?設計難點Design Method of Deep and Large Excavation Adjacent to Metro Transfer HubXie Xiaolin,Zhai Jiequn,Jia Jian(Architectural Design & Research Institute of Tongji University,Shanghai 200092,China)Abstract:Combined with the engineering practices,some design nodus of deep and large excavation of underground urban complex adjacent to metro transfer hub were summarized,then the corresponding solutions,such as three-dimensional finite element modeling analysis,common diaphragm wall design,confined water dewatering effect estimate,were put forward.It provides some reference to similar projects.Keywords:metro transfer hub; deep and large excavation; design nodus作者簡介:謝小林(1979-),男,碩士,工程師,E-mail:thank_xl@163.com。參考文獻[1]劉建航,侯學淵.基坑工程手冊[M]. 北京:中國建筑工業(yè)出版社,1997.