884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2008年>> 第05期>>正文內(nèi)容
大跨度預(yù)應(yīng)力現(xiàn)澆空心板設(shè)計工程實踐
仝為民
摘 要
(北京市建筑工程研究院預(yù)應(yīng)力技術(shù)研究所,北京 100039)
[摘要]大跨度預(yù)應(yīng)力空心板的設(shè)計有不同于普通混凝土空心板和預(yù)應(yīng)力實心板之處,需要在設(shè)計中加以注意?;诮陙碓诒本┑貐^(qū)做的大量的預(yù)應(yīng)力現(xiàn)澆空心板的設(shè)計與施工工作,就預(yù)應(yīng)力現(xiàn)澆空心板的工程設(shè)計中的一些要點及經(jīng)驗進行了簡單的論述。
[關(guān)鍵詞]現(xiàn)澆空心板;預(yù)應(yīng)力;大跨度
Practice of the design of large span prestressed concrete hollow cast slabTong Weimin(Beijing Building Construction Institute, Beijing 100039,China)
Abstract:The design of cast-in-place prestressed concrete hollow slab is different from concrete hollow cast slab or prestressed concrete slab, these differences should be paid attention to during the design. Some key points and some experiences are described based on the large works of the design and construction of large span cast-in-place prestressed concrete hollow slab in Beijing.
Keywords:prestressed concrete hollow cast slab; prestressed concrete; large span
下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點此注冊吧!

    如果你已經(jīng)注冊但還沒登錄,請趕緊點此登錄吧!