884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2014年>> 增刊S1>>正文內(nèi)容
大連百年港灣項目B1區(qū)結(jié)構(gòu)設(shè)計
韓光翔,高放,趙國,王兆君
摘 要

(大連市建筑設(shè)計研究院有限公司,大連116021

 

[摘要] 大連百年港灣項目B1區(qū)通過抗震縫分為普通多層框架裙房和高層框剪塔樓,其裙房部分的超長混凝土框架溫度應(yīng)力分析和高層塔樓立面斜柱節(jié)點分析是本工程的設(shè)計難點。設(shè)計中使用有限元軟件對進(jìn)行計算,并根據(jù)計算結(jié)果采取針對性的加強(qiáng)措施。

[關(guān)鍵詞] 超長框架;溫度應(yīng)力分析;立面斜柱節(jié)點

中圖分類號:TU318TU973    文獻(xiàn)標(biāo)示碼:A

 

Structure design for B1 area of the century harbour in Dalian

Han Guangxiang,Gao Fang,Zhao Guo,Wang ZhaoJun

(Dalian Architectural Design & Research Institute Co.,Ltd,Dalian 116021)

AbstractThe projectB1 area of century harbour in Dalian,is divided into ordinary multi-story frame podiums and tall frame-shear wall towers by seismic joints. The difficult design points of this program are temperature stress analysis about the ultra-long concrete frame structure and joint analysis of inclining column in high-tower elevation. Through calculating with finite element software and analyzing the results, the author takes some strengthening measures.

 

Key wordsOverlong frame structure;Temperature stress analysis;Joints of inclining column in elevation

 

參 考 文 獻(xiàn)

[1] GB5 0496-2009 大體積混凝土施工規(guī)范[S].北京:中國計劃出版社,2009.

[2] JTG D622004 公路鋼筋混凝土及預(yù)應(yīng)力混凝土橋涵設(shè)計規(guī)范[S]. 北京:人民交通出版社,2004.

[3] 王鐵夢.工程結(jié)構(gòu)裂縫控制[M].北京:中國建筑工業(yè)出版社,2000.

 

[4] 張玉明.超長混凝土框架結(jié)構(gòu)裂縫控制研究[D].南京:東南大學(xué),2006.

下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點此注冊吧!

    如果你已經(jīng)注冊但還沒登錄,請趕緊點此登錄吧!