- 摘 要
-
(1 重慶交通大學土木建筑學院, 重慶 400074;
2 招商局重慶交通科研設計院有限公司, 重慶 400067)
[摘要]為研究后植大直徑錨栓系統(tǒng)的錨固性能,采用非線性數(shù)值分析和試驗對比的方法,對其傳力機理、破壞模式、粘結剪應力和承載能力等問題進行研究。結果表明:后植大直徑錨栓的破壞模式表現(xiàn)為淺層錐體(或雙錐體)和深部粘結破壞的混合模式;其粘結剪應力在承受較小軸向荷載時符合基于彈性理論的雙曲函數(shù)分布,在接近極限荷載時趨于均勻分布,但粘結剪應力明顯隨錨栓直徑的增大而減小。采用CCD修正公式來估算的后植大直徑錨栓的承載能力與試驗結果吻合較好。
[關鍵詞]粘結剪應力; 后植大直徑錨栓; 破壞模式; 承載能力
中圖分類號:TU4769 文獻標識碼:A 文章編號:1002-848X(2015)02-0036-05
Nonlinear numerical analysis and experiment comparison of postinstalled largediameter anchor
Zhao Ningyu1, Chen Zhuo2
(1 School of Civil Engineering & Architecture, Chongqing Jiaotong University, Chongqing 400074, China;
2 China Merchants Chongqing Communications Research & Design Institute Co., Ltd., Chongqing 400067, China)
Abstract:To study the anchorage performance of postinstalled largediameter anchor system, the comparison method of nonlinear numerical analysis and experiment were adopted to study force transfer mechanism, failure mode, bond shear stress and bearing capacity. The results show that the failure form of postinstalled largediameter anchor is a mixed form of shallow cone (or double cone) and deep bond failure. The bond shear stress distribution accords with hyperbolic function based on the elasticity theory under the small axial load. The bond shear stress distributes more evenly when ultimate load is closely reached, but significantly decreases with the increase of the anchor diameter. The bearing capacity of postinstalled largediameter anchor estimated with the CCD modified formula is in good agreement with that of experimental result.
Keywords:bond shear stress; post\|installed largediameter anchor; failure mode; bearing capacity
*國家自然科學基金項目(5117849),重慶市自然科學基金(cstc2013jcyjA30019)。
作者簡介:趙寧雨,博士,講師,Email:zny2008@163.com。
參考文獻
[1]JGJ 145—2013 混凝土結構后錨固技術規(guī)程[S].北京:中國建筑工業(yè)出版社,2013.
[2]ELIGEHAUSEN R,
BALOGH T. Behavior of fasteners loaded in tension in craked reinforced concrete[J]. Structural Journal, ACI, 1995, 92(3):365\|379.
[3]DOERR G T. Adhension anchors: behavior and spacing requirements[R]. Austin,1989.
[4]郭戰(zhàn)勝,鄒超英. 化學粘結栓的彈性分析及設計建議[J].哈爾濱建筑大學學報:自然科學版, 2002, 4(3):3639.
[5]COOK R A. Behavior of chemically bonded anchors[J]. Structural Engineering, ASCE, 1993, 119(9):2744262.
[6]ELIGEHAUSEN R, COOK R A, APPL J. Behavior and design adhesive bonded anchors[J]. Structural Journal, ACI, 2006, 103(6):822831.
[7]ACI31805 Building code requirements for structural concrete and commentary[S]. Farmington Hills: American Concrete Institute, 2005.
[8]MACVAY MICHAEL, COOK RONALD A. Pullout simulation of postinstalled chemically bonded anchors[J]. Structural Engineering, ASCE, 1996,122(9):10161024.
[9]Dassault Systèmes Simulia Corp. ABAQUS scripting reference manual version 68 [M].Pawtucket: ABAQUS Inc., 2008.
[10]張勁,王慶揚,胡守營,等.ABAQUS混凝土損傷塑性模型參數(shù)驗證[J].建筑結
[11]ZAVLIARIS K D. An experimental study of adhesively bonded anchorages in concrete[J]. Magazine of Concrete Research, 1996, 175 (48):7993.
[12]YANG KEUNHYEOK, ASHRAF F, ASHOUR. Mechanism analysis for concrete breakout capacity of single anchors in tension[J]. Structural Journal, ACI, 2008,105(5):609616.
[13]FUCHS W, ELIGEHAUSEN R, BREEN J E. Concrete capacity design (CCD) approach for