深圳科技生態(tài)園四區(qū)超高層結(jié)構(gòu)設(shè)計(jì)
王興法1,林超偉1,2,梁莉軍1,過(guò)泓1,黃俊海1,曾德光1,邵建偉1,于桂明1
- 摘 要
-
(1 香港華藝設(shè)計(jì)顧問(wèn)(深圳)有限公司,深圳 518057; 2 廣州大學(xué)土木工程學(xué)院,廣州 510006)[摘要]深圳科技生態(tài)園四區(qū)工程由兩棟超高層塔樓、9層裙樓和3層地下室組成。其結(jié)構(gòu)具有多項(xiàng)不規(guī)則、塔樓超B級(jí)高度、裙樓大底盤不設(shè)縫和西北角35m大跨度懸挑等特點(diǎn)。從結(jié)構(gòu)體系上剖析塔樓、裙樓及整體關(guān)系,就工程特點(diǎn)進(jìn)行結(jié)構(gòu)性能化設(shè)計(jì)、大底盤溫度作用分析及大懸挑專項(xiàng)分析論證。整體性能化分析表明,結(jié)構(gòu)能實(shí)現(xiàn)擬定的性能目標(biāo),此外單塔與雙塔抗震性能結(jié)果相近。重力荷載與溫度作用的非線性分析結(jié)果表明,受力較大部位主要是大跨支座部位與塔樓范圍,設(shè)計(jì)時(shí)應(yīng)予以適當(dāng)加強(qiáng)。有限元分析結(jié)果表明,人字形托柱桁架不僅能滿足承載能力的要求,也能滿足正常使用狀態(tài)的要求。[關(guān)鍵詞]性能化設(shè)計(jì); 溫度作用; 非線性分析; 懸挑桁架; 托柱桁架中圖分類號(hào):TU318.2 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1002-848X(2014)23-0025-05Structural design of the super high-rise building in No. 4 Area of Shenzhen Science Ecological ParkWang Xingfa1, Lin Chaowei1,2, Liang Lijun1, Guo Hong1, Huang Junhai1, Zeng Deguang1, Shao Jianwei1, Yu Guiming1(1 Hong Kong HuaYi Design Consultants(Shenzhen)Ltd., Shenzhen 518057, China; 2 School of Civil Engineering, Guangzhou University, Guangzhou 510006, China)Abstract: The project in No. 4 Area of Shenzhen Ecological Science Park includes two super high-rise towers, a nine-floor podium and a three-floor basement. The structure has features such as multiple irregularities, height over B-level requirement of the code, large base podium without joints and 35m-span cantilever in northwest part. The characteristics of towers, podium and mutual relations were introduced in perspective of structural system. Performance-based structural design, temperature effect analysis for the large base podium and large-span cantilever analysis were carried out according to the project characteristics. Integral performance-based analysis shows that the structure can reach respected performance goals and seismic performances of the single tower and double towers are similar. Results of nonlinear analysis under temperature action and gravity load show that parts with large stress mainly distribute in large-span bearings and towers, which should be appropriately strengthened. Finite element analysis results show that the supporting column transfer truss with the herringbone shape can meet the requirements of carrying capacity and normal operating condition.Keywords: performance-based design; temperature effect; nonlinear analysis; cantilever作者簡(jiǎn)介:王興法,總工程師,教授級(jí)高級(jí)工程師,一級(jí)注冊(cè)結(jié)構(gòu)工程師,Email:xingfa.wang@vip.sina.com。參考文獻(xiàn)[1]GB 50009—2012 建筑結(jié)構(gòu)荷載規(guī)范[S]. 北京:中國(guó)建筑工業(yè)出版社,2012.[2]廣東省建筑科學(xué)研究院. 深圳灣科技生態(tài)城四標(biāo)段風(fēng)致結(jié)構(gòu)荷載分析報(bào)告[R]. 2012.[3]JGJ 3—2010 高層建筑混凝土結(jié)構(gòu)技術(shù)規(guī)程[S]. 北京:中國(guó)建筑工業(yè)出版社,2011.[4]林超偉,王興法,汪洋,等. 某特別不規(guī)則的框支剪力墻結(jié)構(gòu)抗震性能設(shè)計(jì)[J]. 建筑結(jié)構(gòu),2012,42(S2):270-273.[5]香港華藝設(shè)計(jì)顧問(wèn)(深圳)有限公司. 深圳灣科技生態(tài)園四區(qū)結(jié)構(gòu)超限高層抗震設(shè)計(jì)可行性論證報(bào)告 [R].2012.[6]林超偉,王興法,陳勤,等.長(zhǎng)富金茂大廈混凝土收縮徐變分析及結(jié)構(gòu)設(shè)計(jì)[J]. 建筑結(jié)構(gòu),2011,41(5):43-45,59.[7]CEB-FIP Model Code 1990 Design code:comite eurointernational du beton[S]. London: Thomas Telford Ltd, 1993.[8]GB 50010—2010 混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范[S]. 北京:中國(guó)建筑工業(yè)出版社,2011.
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!