山西格盟項目超限高層辦公樓設(shè)計與分析
閆 瑩,徐 斌
- 摘 要
-
(北京市建筑設(shè)計研究院有限公司, 北京 100045)[摘要] 山西格盟金融城中段由5棟高層辦公樓和5棟高層住宅樓及4層大底盤地下車庫組成,5棟高層辦公樓均為鋼筋混凝土框架-核心筒結(jié)構(gòu),建筑高度為119m,中間核心筒高125m。辦公樓的高度超過A級高度,屬于超限高層建筑結(jié)構(gòu),應(yīng)遵守更嚴格的計算和構(gòu)造措施,以滿足抗震設(shè)防目標(biāo)的要求。采用SATWE和ETABS有限元分析與設(shè)計軟件對工程進行了小震和中震的彈性計算,采用SAP2000進行大震靜力彈塑性分析,計算結(jié)果表明本工程整體設(shè)計能夠滿足規(guī)范要求。[關(guān)鍵詞] 超限高層;性能設(shè)計;靜力彈塑性分析中圖分類號:TU375 文獻標(biāo)識碼:A 文章編號:1002-848X(2013)S2-0240-05作者簡介:閆瑩,碩士,工程師,一級注冊結(jié)構(gòu)工程師,Email:yymingyimei@163.com。Design of out-of-codes high-rise buildings of Shanxi Gemeng ProjectYan Ying, Xu Bin(Beijing Institute of Architectural Design, Beijing 100045, China)Abstract: Shanxi Gemeng Project is composed of five high-rise office buildings, five high-rise residential buildings and four underground garages. The five high-rise office buildings are 119 meters high on the ground and the reinforced concrete cores are 125 meters high. They are out-of-codes high-rise buildings. The ultra-limit design instructions are proposed for these buildings. SATWE and ETABS were used to analyze the structure performance under vertical load, wind load and two different grades of earthquake and also checked the structure performance under high earthquake grade using SAP2000. The seismic performance of the corresponding target, take the seismic performance objectives for different parts of the structure, and analysis of the structural system of this project and measures for inspection by the above calculation. Analysis results show that the solutions are feasible, and the overall design meets code requirements.Keyword: out-of-codes high-rise buildings; seismic concept design; Pushover analysis