北京工人體育館抗震加固
盛平,柯長(zhǎng)華,徐福江,李志東,王鐵鋒,苗啟松,黃嘉,朱忠義
- 摘 要
-
(北京市建筑設(shè)計(jì)研究院,100045)[提要]根據(jù)使用要求和鑒定結(jié)果,對(duì)北京工人體育館進(jìn)行抗震加固。通過(guò)多種方案比選,確定了整體加固方案。對(duì)柱采用增大截面方法加固,對(duì)梁、板等采用鍍鋅鋼絲繩網(wǎng)片 聚合物砂漿方法加固。加固后,結(jié)構(gòu)抗震性能得到了改善。分析和試驗(yàn)結(jié)果表明,在屋蓋穩(wěn)定索上直接懸掛吊重,對(duì)原結(jié)構(gòu)影響較小,方案簡(jiǎn)單、滿足安全可靠要求。[關(guān)鍵詞]北京工人體育館;抗震加固;鍍鋅鋼絲繩網(wǎng)片;聚合物砂漿加固;懸索屋蓋Seismic Strengthening of Beijing Worker"s Gym/Sheng Ping, Ke Changhua, Xu Fujiang, Li Zhidong, Wang Tiefeng, Miao Qisong, Huang Jia, Zhu Zhongyi (Beijing Institute of Architectural Design, Beijing 100045, China)Abstract: According to the service requirements and seismic appraiser results, Beijing Worker"s Gym is seismically strengthened. Strengthening method is determined after comparison of different measures. The columns are strengthened with reinforced concrete, beams, slabs are strengthened with wire rope net polymer mortar method. After strengthening, the seismic performance of Beijing Worker s Gym is enhanced. The additional load is directly exerted on the stabilizing cable. Analysis and experiments show that this method is easy and safe.Keywords: Beijing Worker"s Gym; seismic strengthening; galvanic wire rope ne-polymer mortar; cable supported roof
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!