- 摘 要
-
(1 湖南大學(xué)土木工程學(xué)院, 長沙 410082; 2 貴州大學(xué)空間結(jié)構(gòu)研究中心, 貴陽 550003;3 長沙巨星輕質(zhì)建材股份有限公司, 長沙 410205)
[摘要]長沙市巨星創(chuàng)業(yè)基地多層大跨度輕型工業(yè)廠房樓蓋采用裝配整體式鋼-混凝土組合空腹樓蓋結(jié)構(gòu)體系,該樓蓋主要由上層鋼筋混凝土肋板、下層T形鋼肋以及方形鋼管剪力鍵組成,上層帶肋板與下層鋼肋均在工廠預(yù)制。通過分析結(jié)構(gòu)的實際受力狀態(tài),擬定了結(jié)構(gòu)在設(shè)計時需要采取的技術(shù)措施、設(shè)計要求以及施工工藝,并對關(guān)鍵構(gòu)件和節(jié)點的計算與構(gòu)造進(jìn)行了介紹。采用此種方法進(jìn)行設(shè)計能夠保證結(jié)構(gòu)的安全可靠,對相關(guān)工程設(shè)計有一定的借鑒作用。
[關(guān)鍵詞]裝配整體式; 鋼-混凝土組合空腹樓板; 大跨度多層廠房; 結(jié)構(gòu)設(shè)計
中圖分類號:TU398.9,TU318 文獻(xiàn)標(biāo)識碼:A 文章編號:1002-848X(2014)13-0005-04
Structural design of large-span prefabricated integral steel-concrete composite hollow slabs
Yang Qizhu1, Ma Kejian1,2, Zhang Huagang2, Hu Lan1, Hu Ping3
(1 College of Civil Engineering, Hunan University, Changsha 410082, China; 2 Research Center of Space Structures, Guizhou University, Guiyang 550003, China; 3 Changsha Great Star New Building Materials Co., Ltd., Changsha 410205, China)
Abstract: Prefabricated integral steel-concrete composite hollow slab structural system was adopted in the large-span multistory light industrial factory for Great Star entrepreneurship base in Changsha City. The system was made up of upper layer reinforced concrete rib-floor, lower layer T-shaped steel ribs and square steel tube shear key. The top prefabricated ribbed plates and bottom steel ribs were prefabricated in factories. Through the analysis of the structure under actual stress state, the technical measures, design requirements and construction techniques were studied. The calculation and structural details of key components and nodes were introduced. The structure is safe and reliable using this design method, which can provide some reference for engineering design.
Keywords: prefabricated integral; steel-concrete composite hollow slab; large-span multistory factory; structural design
*“十二五”國家科技支撐計劃(2011BAJ09B0101),國家自然科學(xué)基金項目(50968004)。
作者簡介:楊期柱,博士研究生,Email:yangqizhu@hnu.edu.cn。
參考文獻(xiàn)
[1]馬克儉,張華剛,鄭濤. 新型建筑空間網(wǎng)格結(jié)構(gòu)理論與實踐[M].北京:人民交通出版社,2006.
[2]楊期柱,馬克儉,張華剛,等.大跨度裝配整體式鋼-混凝土組合空腹樓蓋受力性能試驗研究[J].建筑結(jié)構(gòu)學(xué)報,2013,34(10):32-40.
[3]DB 22/48—2005 鋼筋混凝土空腹夾層板樓蓋結(jié)構(gòu)技術(shù)規(guī)程[S]. 貴陽:貴州省建設(shè)廳,2005.
[4]GB 50010—2010混凝土結(jié)構(gòu)設(shè)計規(guī)范[S]. 北京: 中國建筑工業(yè)出版社, 2011.
[5]GB 50017—2003鋼結(jié)構(gòu)設(shè)計規(guī)范[S]. 北京: 中國計劃出版社, 2003.