- 摘 要
-
(北京首鋼國際工程技術(shù)有限公司, 北京 100043)
[摘要]某熱軋廠設(shè)備箱形基礎(chǔ)長約500m、寬40~60m,底面積巨大。熱軋生產(chǎn)線設(shè)備標(biāo)高精度對基礎(chǔ)差異沉降要求非常嚴(yán)格。采用樁基容易滿足對熱軋?jiān)O(shè)備箱形基礎(chǔ)差異沉降的要求,但耗資巨大;不采用樁基則節(jié)省投資,但存在后期差異沉降較大的風(fēng)險(xiǎn),從而影響生產(chǎn)。對樁基方案與強(qiáng)夯地基處理方案進(jìn)行了比較,并在各自基礎(chǔ)沉降完成全過程期間(包括生產(chǎn)階段),對工期、費(fèi)用、生產(chǎn)風(fēng)險(xiǎn)進(jìn)行比較,綜合評估這兩種地基處理方案的優(yōu)劣。
[關(guān)鍵詞]箱形基礎(chǔ); 樁基; 強(qiáng)夯地基; 差異沉降; 生產(chǎn)階段; 工期; 費(fèi)用
中圖分類號:TU473,TU472 文獻(xiàn)標(biāo)識碼:A 文章編號:1002-848X(2014)08-0053-04
Comparison of ground treatment schemes for a hot strip mill equipment box foundation
Zhang Xiaolun
(Beijing Shougang International Engineering Technology Co., Ltd., Beijing 100043, China)
Abstract: Equipment box foundation of a hot strip mill has a large area with 500 meters length and 40~60 meters width. Hot strip mill equipment’s elevation accuracy calls for strict requirements for the differential settlement of the foundation. The pile foundation is easy to satisfy the requirements of differential settlement, but the cost is huge. Investment is saved if pile foundation is not used, but the differential settlement is a big risk and it will affect production. The construction period, cost and production risk of the pile foundation and the dynamic compaction ground foundation were compared in the whole process of foundation settlement period (including the production stage) to comprehensively evaluate the pros and cons of two foundation treatments.
Keywords: box foundation; pile foundation; dynamic compaction ground foundation; differential settlement; production stage; construction period; cost
作者簡介:張孝輪,本科,工程師,主管設(shè)計(jì)師,一級注冊結(jié)構(gòu)工程師,Email:zhangxiaolun521@sina.com。
參考文獻(xiàn)
[1]GB 50696—2011 鋼鐵企業(yè)冶金設(shè)備基礎(chǔ)設(shè)計(jì)規(guī)范[S].北京:中國計(jì)劃出版社,2011.
[2]GB 50007—2011 建筑地基基礎(chǔ)設(shè)計(jì)規(guī)范[S].北京:中國建筑工業(yè)出版社,2012.
[3]JGJ 79—2012 建筑地基處理技術(shù)規(guī)范[S].北京:中國建筑工業(yè)出版社,2012.
[4]建筑地基基礎(chǔ)設(shè)計(jì)規(guī)范理解與應(yīng)用[M].2版. 北京:中國建筑工業(yè)出版社,2012.
[5]顧曉魯,錢鴻縉,劉惠珊,等.地基及基礎(chǔ)[M].3版. 北京:中國建筑工業(yè)出版社,2003.
[6]JGJ 6—2011 高層建筑筏形與箱形基礎(chǔ)技術(shù)規(guī)范[S].北京:中國建筑工業(yè)出版社,2011.
[7]JGJ 94—2008 建筑樁基技術(shù)規(guī)范[S].北京:中國建筑工業(yè)出版社,2008.