地震動時程模擬的工程方法研究現(xiàn)狀與預測
何 穎1,竇玉斌2
- 摘 要
-
(1 天津大學建筑工程學院,天津 300072;2 天津大學建筑設計研究院,天津300072)[摘要] 針本文對模擬強地震動的工程方法進行了簡要總結,闡述了其主要思路和步驟,以及發(fā)展的歷程和進一步發(fā)展的方向。[關鍵詞]地震動時程;模擬;非平穩(wěn);頻域方法;時域方法中圖分類號:TU311.3 文獻標識碼:A 文章編號:1002-848X(2013)S1-0624-03Present state of engineering method of simulating seismic time history He Ying1,Dou Yubin2(1 School of Civil Engineering,Tianjin University,Tianjin 300072,China; 2 Tianjin University Research Institute of Architectural Design, Tianjin 300073,China)Abstract:Engineering method of simulating strong seismic motion is briefly summed up. The paper illuminates basic ideas, steps, and the present approach of research.Keyword:seismic time history, simulation, non-stationary, frequency-domain method, time-domain method