884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2013年>> 第24期>>正文內(nèi)容
上海中心大廈幕墻支撐結(jié)構(gòu)關(guān)鍵節(jié)點(diǎn)分析設(shè)計(jì)*
何志軍,丁潔民,李久鵬
摘 要

 

(同濟(jì)大學(xué)建筑設(shè)計(jì)研究院(集團(tuán))有限公司, 上海 200092
 
[摘要]上海中心大廈采用了分區(qū)懸掛的幕墻支撐結(jié)構(gòu)體系,在各類荷載及非荷載效應(yīng)下,幕墻支撐結(jié)構(gòu)會(huì)相對(duì)主體結(jié)構(gòu)產(chǎn)生較大的相對(duì)位移,主體結(jié)構(gòu)的變形也會(huì)在幕墻支撐結(jié)構(gòu)內(nèi)部產(chǎn)生較大的次應(yīng)力,為保證幕墻支撐結(jié)構(gòu)正常使用,防止因支撐結(jié)構(gòu)失效造成玻璃破碎,在幕墻支撐結(jié)構(gòu)與主體結(jié)構(gòu)的連接位置創(chuàng)造性地設(shè)計(jì)了幾種特殊節(jié)點(diǎn)。對(duì)幕墻支撐結(jié)構(gòu)特殊節(jié)點(diǎn)的構(gòu)造及分析、設(shè)計(jì)情況進(jìn)行了系統(tǒng)的闡述,重點(diǎn)介紹了豎向伸縮節(jié)點(diǎn)及短支撐內(nèi)端節(jié)點(diǎn)兩類節(jié)點(diǎn),同時(shí)對(duì)水平伸縮節(jié)點(diǎn)、交叉支撐內(nèi)端節(jié)點(diǎn)、限位約束節(jié)點(diǎn)等節(jié)點(diǎn)類型也給予簡(jiǎn)要說明。
[關(guān)鍵詞]上海中心大廈; 幕墻; 支撐結(jié)構(gòu); 滑動(dòng)節(jié)點(diǎn); 節(jié)點(diǎn)分析設(shè)計(jì)
中圖分類號(hào):TU318,TU973        文獻(xiàn)標(biāo)識(shí)碼:A        文章編號(hào):1002-848X(2013)24-0012-06
 
Analysis and design of key connection of curtain wall support structure of Shanghai Tower
He Zhijun, Ding Jiemin,  Li Jiupeng
Architectural Design & Research Institute of Tongji University (Group) Co., Ltd., Shanghai 200092, China
 
Abstract: A unique flexible suspend curtain wall support structure (CWSS) was developed to suit exterior curtain wall system of Shanghai Tower. Under various loads and effectthere are lots of relative displacement between main structure and curtain wall and larger additional stress is also produced in CWSS. In order to absorb the relative displacement between the curtain wall system and main structure and ensure safety and service and prevent glass breaking caused by failure of CWSS, a large number of special connections were designed to link the curtain wall and main structure. Several key issues of CWSS such as connection details and difficulties of design and analysis were introduced. Vertical expansion connection and inner end joint of short radial strut were introduced in detail, and some other kinds of connections adopted in CWSS were also introduced briefly.
Keywords: Shanghai Tower; curtain wall; support structure; slipping connection; analysis and design of connection
*上海市科技攻關(guān)計(jì)劃項(xiàng)目(09dz1207704)。
 
通訊作者:丁潔民,教授,博士生導(dǎo)師,Email:Djm@tjadri.com
 
參考文獻(xiàn)
1]丁潔民,何志軍,李久鵬. 上海中心大廈新型柔性懸掛式幕墻系統(tǒng)設(shè)計(jì)[J. 建筑結(jié)構(gòu), 20134324): 1-5.
2]丁潔民,何志軍,李久鵬,等. 上海中心大廈懸掛式幕墻支撐結(jié)構(gòu)設(shè)計(jì)若干關(guān)鍵問題[J. 建筑結(jié)構(gòu), 2013,4324):6-11.
3]同濟(jì)大學(xué)鋼與輕型結(jié)構(gòu)實(shí)驗(yàn)室.上海中心外幕墻體系滑移支座研究報(bào)告[R.2012.
4]李久鵬. 上海中心大廈吊掛式幕墻支撐結(jié)構(gòu)分析與設(shè)計(jì)若干關(guān)鍵問題研究[D.上海:同濟(jì)大學(xué),2013.
5Dassault Systems Simulia Corp. ABAQUS theory manualM. 2010.
下載地址

    你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!