碧羅雪山大酒店結(jié)構(gòu)設(shè)計(jì)
楊聰武,馮銘,曹志丹,譚詠梅
- 摘 要
-
(昆鋼集團(tuán)設(shè)計(jì)院有限公司, 安寧 650302)[摘要]碧羅雪山大酒店高99.28m,結(jié)構(gòu)體系為框架-支撐結(jié)構(gòu)。建筑物在23層分為東、西兩塔,26層雙塔連體,為復(fù)雜高層建筑。通過(guò)優(yōu)化結(jié)構(gòu)和構(gòu)件布置,合理選用耗能構(gòu)件和輕質(zhì)建材,對(duì)關(guān)鍵部位和薄弱環(huán)節(jié)采用抗震性能化設(shè)計(jì)并采取針對(duì)性的加強(qiáng)措施,減小了結(jié)構(gòu)地震作用效應(yīng),提高了結(jié)構(gòu)的延性和耗能能力,實(shí)現(xiàn)了“大震不倒”的抗震設(shè)防要求。[關(guān)鍵詞]框架-支撐結(jié)構(gòu); 屈曲約束支撐; 連體結(jié)構(gòu); 性能化設(shè)計(jì)中圖分類(lèi)號(hào):TU318.2 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1002-848X(2013)21-0042-05Structural design of Biluo Snow-capped Mountains HotelYang Congwu, Feng Ming, Cao Zhidan, Tan Yongmei(Kunming Iron & Steel Group Design Institute Co., Ltd., Anning 650302, China)Abstract: Biluo Snow-capped Mountains Hotel adopts braced-frame structural system with height of 99.28m. The building is divided into two towers of East and West in 23rd story, and two towers merge in 26th story, and it is a complex high-rise building. Structural seismic effects are reduced and ductility is improved as well as energy dissipation capacity to fulfill the requirements of “not collapse under rare earthquake” according to the following measures, such as optimization of the structure and component arrangements, reasonable selection of energy dissipation components and light building materials, and adoption of performance based seismic design in key and weak parts with targeting strengthened measures.Keywords: braced-frame structure; buckling restrained brace; conjoined structure; performance based seismic design作者簡(jiǎn)介:楊聰武,一級(jí)注冊(cè)結(jié)構(gòu)工程師,Email:kgjtycw@126.com。參考文獻(xiàn)[1]中國(guó)建筑科學(xué)研究院PKPM CAD工程部. 多層或高層建筑結(jié)構(gòu)空間有限元分析與設(shè)計(jì)軟件(墻元模型)SATWE(2010版)[M]. 2011.[2]上海市金屬結(jié)構(gòu)協(xié)會(huì),同濟(jì)大學(xué)多高層鋼結(jié)構(gòu)及鋼結(jié)構(gòu)抗火研究室. TJ型屈曲約束支撐設(shè)計(jì)手冊(cè)[M].上海:2010.
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!