哈爾濱香坊公安分局辦公樓設(shè)計(jì)*
王鳳來(lái)1,張厚2,孫緒杰2,3,劉偉2
- 摘 要
-
(1 哈爾濱工業(yè)大學(xué)土木工程學(xué)院, 哈爾濱 150090; 2 黑龍江省建設(shè)集團(tuán)有限責(zé)任公司,哈爾濱 150046; 3 黑龍江工程學(xué)院土木與建筑工程學(xué)院, 哈爾濱 150050)[摘要]規(guī)范中對(duì)配筋砌塊建筑的適用高度的限制,很大程度上是因?yàn)楫?dāng)前最常用的190mm厚砌塊難以滿足高于60m的建筑物所需的承載力要求。結(jié)合試驗(yàn)成果,將290mm厚砌塊引入到配筋砌塊高層建筑的實(shí)踐中,建成我國(guó)首棟采用290mm厚砌塊的建筑物。工程外墻采用290mm厚砌塊,內(nèi)墻采用190mm厚砌塊,通過(guò)完善的設(shè)計(jì)與分析,探索290mm厚度砌塊在應(yīng)用中的問(wèn)題,并為將來(lái)建設(shè)更高的配筋砌塊建筑積累經(jīng)驗(yàn)。[關(guān)鍵詞]高層建筑; 配筋砌塊砌體結(jié)構(gòu); 結(jié)構(gòu)設(shè)計(jì); 抗震性能中圖分類號(hào):TU318.2,TU364 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1002-848X(2013)21-0027-05Structural design of office building of Xiangfang Public Security Sub-bureau in HarbinWang Fenglai1, Zhang Hou2, Sun Xujie2,3, Liu Wei2(1 School of Civil Engineering, Harbin Institute of Technology, Harbin 150090,China; 2 Heilongjiang Provincial Construction Group Co., Ltd., Harbin 150046, China; 3 School of Civil and Architecture Engineering, Heilongjiang Institute of Technology, Harbin 150050, China)Abstract: Applicable maximum height for reinforced block structure is restricted by code due to the insufficient bearing capacity of 190mm thick block. Based on test results, 290mm thick block is used in practice of reinforced block high-rise building to embrace the born of first building with 290mm thick block in China. In this building, 290mm thick blocks are used for exterior wall and 190mm thick blocks for interior wall. Through comprehensive analysis and design, questions of 290mm thick block in the application was explored to accumulate experience for the construction of higher reinforced block buildings in the future.Keywords: high-rise building; reinforced block structure; structural design; seismic performance*國(guó)家科技支撐計(jì)劃(2011BAE14B05-03)。作者簡(jiǎn)介:王鳳來(lái),博士,教授,Email: wflai@sina.com。參考文獻(xiàn)[1]王鳳來(lái),張厚,唐岱新. 混凝土砌塊產(chǎn)業(yè)的發(fā)展與教訓(xùn)[A]//新型砌體結(jié)構(gòu)體系與墻體材料(上). 北京:中國(guó)建材工業(yè)出版社,2010:1-10.[2]王鳳來(lái),陳再現(xiàn). 配筋砌塊砌體結(jié)構(gòu)承重墻體系發(fā)展概況及應(yīng)用效益分析[J]. 墻材革新與建筑節(jié)能,2009(3):43-46.[3]王鳳來(lái),孫緒杰,潘景龍. 砌塊整澆墻結(jié)構(gòu)建設(shè)百米辦公樓的技術(shù)可行性[C]//第十三屆高層建筑抗震技術(shù)交流會(huì)論文集. 2011.[4]SUN XUJIE, ZHANG HOU, LU DAGANG,et al. Study on seismic performance of reinforced concrete masonry high-rise building[J].Applied Mechanics and Materials,2012, 166-169: 2164-2170.[5]張亮. 240、290寬砌塊整澆墻標(biāo)準(zhǔn)抗壓試驗(yàn)研究[D]. 哈爾濱:哈爾濱工業(yè)大學(xué),2010.[6]李利剛. 低周往復(fù)荷載下290厚砌塊整澆墻彎曲破壞模式試驗(yàn)研究[D]. 哈爾濱:哈爾濱工業(yè)大學(xué),2011.[7]中國(guó)建筑科學(xué)研究院PKPMCAD工程部. PUSH&EPDA多層級(jí)高層建筑結(jié)構(gòu)彈塑性靜力、動(dòng)力分析軟件用戶手冊(cè)[M]. 2010.
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!