884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2007年>> 第10期>>正文內(nèi)容
西安鐘鼓樓廣場及地下工程結(jié)構(gòu)設(shè)計
朱煒
摘 要
(中國建筑西北設(shè)計研究院,西安710003) 
[提要]西安鐘鼓樓廣場及地下工程是西安市重點工程。為了降低結(jié)構(gòu)高度及減小開挖深度,工程采用了無梁樓蓋體系。采取措施避免降水對古建筑鐘鼓樓的影響。對超長結(jié)構(gòu)采取了較為合理的結(jié)構(gòu)措施,降低了溫度效應(yīng)的影響。對工程的重點部位的詳細(xì)設(shè)計進(jìn)行了探討??晒╊愃乒こ虆⒖?。
[關(guān)鍵詞]無梁樓蓋;超長結(jié)構(gòu);平戰(zhàn)結(jié)合;護(hù)坡樁
Construction and Underground Structure Design of Xi"an Bell and Drum Tower Square /Zhu Wei(China Northwest Building Design Research Institute, Xi"an 710003, China)
Abstract:The construction and underground structure design of bell and drum tower square are introduced.The beamless roof structure is adopted  to reduce the structural height and depth of pit.Some measures are used to avoid the influence of fall water height on settlement of ball and drum tower.The suitable structural measures are utitized for the super long structure to reduce the influence of degree effect.Some detail designs are presented.
Keywords:beamless roof structure; ultra leng stracture; union of peacetime and wartime; slope protected pile
下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點此注冊吧!

    如果你已經(jīng)注冊但還沒登錄,請趕緊點此登錄吧!